Plan the Right Line Before You Buy.
Clear requirements, matched equipment and a workable factory layout—confirmed before production starts.
Five checks that prevent expensive changes later.
Each step closes one common project risk before equipment enters production.
-
01 Clarify the Real Requirement
Bottle size, product, capacity and packing method are aligned first—so the quotation is based on the line you actually need.
Deliverable Confirmed requirement brief
-
02 Match Water Treatment to the Source
Raw-water data and local standards guide the treatment process—avoiding an oversized or incomplete system.
Deliverable Recommended treatment process and capacity
-
03 Configure the Complete Line
Blowing, filling, labeling, packing and palletizing are matched by speed, bottle format and future expansion needs.
Deliverable Equipment scope and line configuration
-
04 Make the Layout Work Before Installation
Equipment flow, operator access, utilities and maintenance space are checked against the real building—not an ideal drawing.
Deliverable Factory layout and utility list
-
05 Lock the Scope Before Order
Interfaces, key components, commercial boundaries and the project schedule are reviewed together—reducing later disputes and additions.
Deliverable Technical proposal, quotation and project schedule
Four inputs are enough to start.
If some data is not ready, our team will help define it step by step.
Product & bottle
Target BPH
Raw-water report
Factory dimensions
Avoid redesigning the line after production starts.
Send the basic project data and receive a coordinated proposal for the complete line.