Existing producer expanding capacity
The customer needed a higher-output line for fast-moving 250 ml bottled water.
Turnkey Project · Indonesia
Project Type: Existing Water Factory · Capacity Expansion
Project Evidence
On-site records should show what was delivered, how the team worked and whether the line is running—not generic promotional machinery.
Running Video
The video loads only after the visitor clicks, helping preserve page speed while keeping operating proof near the top.
Project at a Glance
Four short points replace the V1 overview paragraph and help buyers judge relevance in seconds.
The customer needed a higher-output line for fast-moving 250 ml bottled water.
The line had to coordinate high-speed bottle movement through end-of-line handling.
Line planning, equipment integration, QC, delivery, commissioning and training.
The complete line is installed and operating at the customer’s site.
Engineering Challenges & Solutions
Only real project issues should appear here. Each challenge is paired with the action taken by the engineering team.
The bottle size required careful transfer between air conveyor, filling and downstream conveying.
Solution Adjusted air conveying, speed coordination and bottle accumulation logic.Independent machines could not simply run at their nominal maximum speeds.
Solution Set operating logic, buffer zones and linked start-stop control for stable flow.Equipment unloading and installation order had to match the on-site plan.
Solution Planned container loading, customs, inland transfer and staged unloading.Mechanical, electrical and operating teams needed a single commissioning sequence.
Solution On-site connection, testing, operator training and follow-up support.Delivery Scope
Each project displays only the services and systems that were actually included in the approved contract.
Dynamic rule: unchecked delivery items remain hidden.
Installed Equipment
Equipment is shown by functional category. Exact models remain part of technical selection and quotation.
Prepares source water for the approved bottling process.
View equipment →Produces PET bottles and fills water in one coordinated system.
View equipment →Applies labels and checks key finished-bottle conditions.
View equipment →Groups, wraps and prepares bottles for warehouse handling.
View equipment →Project Results
Operational metrics appear only when a source, observation period and permission to publish are recorded.
The template will not treat rated capacity as actual output. Cumulative production must include an “as of” date.
Project Delivery
A compact timeline demonstrates the real delivery process without slowing down the main project story.
Product, capacity and bottle
Configuration approved
Quality inspection
Six-container delivery
On-site testing
Line running
Related Solutions
These cards link to reusable Production Line solutions. Additional project videos, if used, belong under “More Lines in Operation.”
Share your requirements and 777Pack will recommend a preliminary line configuration based on your product and project conditions.
Product · Capacity · Bottle Size · Packaging · Project Location