Home / Projects / 33,000 BPH PET Water Line
Installed & Running
Installed & Running

Turnkey Project · Indonesia

33,000 BPH PET Bottled Water Line

Project Type: Existing Water Factory · Capacity Expansion

Rated Output33,000 BPH @ 250 ml
ProductPurified Bottled Water
ContainerPET · 250 ml
AutomationFully Automatic
Project GoalHigher output, less handling
777Pack ScopeTurnkey · Door-to-Door
Delivery6 Containers
MarketIndonesia

Project Evidence

Real work. Real equipment. Real production.

On-site records should show what was delivered, how the team worked and whether the line is running—not generic promotional machinery.

Running Video

See the line in operation.

The video loads only after the visitor clicks, helping preserve page speed while keeping operating proof near the top.

33,000 BPH · 250 ml PETComplete line running at customer site

Project at a Glance

The essential context—without a long introduction.

Four short points replace the V1 overview paragraph and help buyers judge relevance in seconds.

01 · BACKGROUND

Existing producer expanding capacity

The customer needed a higher-output line for fast-moving 250 ml bottled water.

02 · PROJECT GOAL

More output, less manual handling

The line had to coordinate high-speed bottle movement through end-of-line handling.

03 · 777PACK ROLE

One coordinated delivery scope

Line planning, equipment integration, QC, delivery, commissioning and training.

04 · FINAL STATUS

Commissioned and producing

The complete line is installed and operating at the customer’s site.

Engineering Challenges & Solutions

Specific problems. Practical on-site responses.

Only real project issues should appear here. Each challenge is paired with the action taken by the engineering team.

01

Lightweight 250 ml bottles became unstable at high speed

The bottle size required careful transfer between air conveyor, filling and downstream conveying.

Solution Adjusted air conveying, speed coordination and bottle accumulation logic.
02

Multiple systems needed one coordinated line speed

Independent machines could not simply run at their nominal maximum speeds.

Solution Set operating logic, buffer zones and linked start-stop control for stable flow.
03

Six-container door-to-door delivery required precise sequencing

Equipment unloading and installation order had to match the on-site plan.

Solution Planned container loading, customs, inland transfer and staged unloading.
04

Installation coordination across the complete line

Mechanical, electrical and operating teams needed a single commissioning sequence.

Solution On-site connection, testing, operator training and follow-up support.

Delivery Scope

What 777Pack delivered.

Each project displays only the services and systems that were actually included in the approved contract.

Solution Design
Factory Layout Planning
Equipment Supply
Quality Inspection & FAT
International Delivery
Installation & Commissioning
Operator Training
After-sales Support

Dynamic rule: unchecked delivery items remain hidden.

Installed Equipment

The systems included in this project.

Equipment is shown by functional category. Exact models remain part of technical selection and quotation.

Supplied by 777Pack

Water Treatment System

Prepares source water for the approved bottling process.

View equipment →
Supplied by 777Pack

Blowing–Filling Combiblock

Produces PET bottles and fills water in one coordinated system.

View equipment →
Supplied by 777Pack

Labeling & Inspection

Applies labels and checks key finished-bottle conditions.

View equipment →
Supplied by 777Pack

Packaging & Palletizing

Groups, wraps and prepares bottles for warehouse handling.

View equipment →

Project Results

Confirmed facts—not estimated claims.

Operational metrics appear only when a source, observation period and permission to publish are recorded.

33,000Rated BPH @ 250 mlApproved line specification
RunningCurrent project statusCommissioned at customer site
6Containers deliveredDoor-to-door project scope
Hidden until verifiedEfficiency / cumulative outputRequires source, date and permission

The template will not treat rated capacity as actual output. Cumulative production must include an “as of” date.

Project Delivery

From requirement to production.

A compact timeline demonstrates the real delivery process without slowing down the main project story.

01

Requirement Confirmed

Product, capacity and bottle

02

Layout & Scope

Configuration approved

03

Manufacturing & FAT

Quality inspection

04

Shipment

Six-container delivery

05

Commissioning

On-site testing

06

Production

Line running

Related Solutions

Explore production lines for similar requirements.

These cards link to reusable Production Line solutions. Additional project videos, if used, belong under “More Lines in Operation.”

Planning a similar production line?

Share your requirements and 777Pack will recommend a preliminary line configuration based on your product and project conditions.

Product · Capacity · Bottle Size · Packaging · Project Location

Request a Line Proposal →