Juice Turnkey Solution

Turnkey Juice Bottling Lines

Select your juice bottling process around the recipe, packaging and finished-product requirements before selecting machines. 777Pack coordinates product preparation, container preparation, filling and downstream packaging through China manufacturing and project support.

China manufacturing & engineeringIndonesia local project support
Juice bottle filling application

Juice filling application. Equipment selection follows the confirmed product and container requirements.

Plan before selecting machines

Four decisions shape your juice line

Start with the product and sales format, then define the complete production scope.

01

Is hot filling suitable for my juice?

Share the recipe, product characteristics and target shelf life for process review. The PET hot-fill flow below is one application, rather than a standard for every juice.

02

Can the equipment handle my product?

Provide the actual product specification, including any pulp or other particles. Product handling and filling suitability need confirmation before the equipment scope is finalized.

03

Are my bottle and cap suitable?

Review the bottle, preform, neck finish and closure against the selected filling process and packaging supplier’s specifications.

04

How will I change products or formats?

List planned recipes, bottle sizes and production batches. The proposal should address cleaning requirements, product changeovers and container change parts.

Production flow

Example Process: PET Juice Hot Filling

Product preparation and bottle blowing run in parallel before hot filling. Other recipes, containers or preservation processes require a separately reviewed production flow.

Equipment and process stages are selected for the agreed product, container and output. Optional treatment, inspection, cleaning and material-handling requirements are confirmed during project review.

Explore equipment by function

Connect the equipment around your project

Review the relevant equipment categories. The final configuration defines the selected machines, interfaces and format requirements.

Review specific equipment options

Open the machine details to compare the application, models and interfaces. The selected equipment must match your approved product, packaging and line output.

Rotary OPP Labeling · CY-XR

Compare rotary roll-fed labeling when your round-bottle format and production speed require a different configuration. Confirm the bottle is ready for labeling after cooling and drying.

Factory layout & project specification

Turn your requirements into a practical factory plan

Share your building drawing and production requirements. The proposal should connect equipment placement with material flow, working space, utilities and acceptance conditions.

  • Recipe & Product Requirements

    Product specification, preparation requirements, target shelf life and available process documentation.

  • Container & Filling Process

    Bottle and closure specifications, intended filling method and packaging supplier requirements.

  • Production & Changeovers

    Required output, recipe range, batch schedule, bottle sizes and cleaning expectations.

  • Factory & Delivery Scope

    Building dimensions, utilities, process interfaces, installation responsibilities and acceptance conditions.

Discuss Your Factory Layout →
Example production line factory layout drawing

Layout example for planning discussion. Your arrangement is developed around the confirmed product process, equipment scope and building.

Scope & investment

What affects the cost of your line?

A useful quotation is based on the product process, formats and equipment scope. Confirm the supply boundary, site preparation and delivery responsibilities alongside the equipment price.

  • 01

    Product preparation and required processing equipment.

  • 02

    The agreed filling process and compatible packaging.

  • 03

    Recipe changes, cleaning and format changeover requirements.

  • 04

    Cooling, labeling, packing, automation and site support.

From proposal to start-up

Define the delivery scope and responsibilities

777Pack coordinates engineering, manufacturing and line integration in China, with local project support in Indonesia. Confirm each delivery and support arrangement in your project proposal.

01

Requirements & Layout

Confirm products, formats, equipment scope, interfaces and the factory arrangement.

02

Manufacturing & FAT

Agree on test materials, factory acceptance checks and the conditions used for testing.

03

Installation & Commissioning

Plan site preparation, utility readiness, equipment installation and start-up responsibilities.

04

Training & After-Sales

Confirm operator training, maintenance procedures, spare parts and ongoing support.

Buyer questions

Juice Line FAQ

Does this flow apply to all juice products?

No. It illustrates a PET hot-fill application. Other recipes, containers or preservation processes may require different equipment and a different validated production flow.

Can you quote from bottle size and capacity alone?

These are starting inputs. Product specifications, filling process, preparation requirements, packaging and factory conditions are also needed to define a useful equipment proposal.

What needs to be confirmed before ordering?

Confirm product and container suitability, equipment interfaces, cleaning arrangements, utilities, delivery responsibilities and the agreed testing and acceptance conditions.

Build your project brief

Plan your juice production line

Send your product specification or recipe summary, intended filling process, bottle and closure details, required output, packaging format, factory drawing and installation country.